Floor Spring Installation: Plan the Pivot and Finished Floor

A concealed floor spring needs more planning than a neat cover plate. Before a new shop or office floor is closed up, confirm the exact closer, pivot arrangement and finished-floor level with the installer.
Use the right installation drawing
dormakaba's BTS80 library lists separate packages for centre-hung, offset, single-action and double-action doors. Match the exact model and package; dimensions from another floor spring are not a substitute for its template.
Check the floor box and pivot
- For BTS80, the maker's instructions require the cement-case top to be flush with the finished floor, with the case level and parallel to the frame.
- The spindle centreline must be accurately located for the door's pivot point. Have the installer verify this before permanently fixing the box.
- Confirm the specified door arm, top pivot, spindle and clearances against the chosen system's drawing, not just the visible cover size.
The CISA F5003/4 guide likewise requires levelling and securing its closer in the supplied box. It warns against dismantling the body because it contains a pre-stressed spring under pressure.
Use a qualified installer rather than improvising around a poorly positioned box. For control terminology, see our door-closer settings guide.
Sources checked 6 November 2026: dormakaba library updated 1 May 2026; CISA guide July 2025.